We completely remodeled our 3 bathrooms, so I decided to setup a camera to take time-lapse video of the entire work done in the master bathroom. I used a Nikon D7000 with a 10.5mm fisheye lens mounted on a Gorilla Grip tripod attached to a ventilation grill. I took a picture every 30 seconds during the 34 days of the remodel, for a grand total of 17,970 pictures.
34 days……..I'd be pissed.
Great Job
un coglione sei
holy crap – the bathroom didn't seem to be in that bad of shape to have to rip the whole thing apart.
Although the finished product looks better, I think it was unnecessary to spend all that money and time to remodel it. It looked fine before
who actually likes it more before i mean get real
10:05 XD!
Toilet?
Looked better before 😂
In Germany we need less than 10 days with new pipes and we have stonewalls 😉
10:05 GHOST!! ghost help this work OMG!!
I feel like it was better before 😐😞
So satisfying. Awesome job.
All these poor sods finding any old shit to whinge about, it looks fab
I prefer the old vanity lights
No toilet?
That would take myself, my plumbers, and my tile guy 2 weeks at the MOST.
The shape of da baf ruum Luks liek mine
HOW DID THING MOVE BY THEMSELVES
So no insulation in interior or exterior walls at all? Nice…….
Anyone in UK like! PLUGS IN THE BATHROOM! RUN!
Before was better than after – my opinion. 😀
I think this is worth $900k